HOGG FUEL AND SUPPLY

Kitchener, Ontario

Design and construction of a unique temperature control system for a cement slurry tank installation. Involved the installation of heating, cooling and filtration equipment as well as temperature sensors and controllers.

PRC CANADA INC.

Rexdale, Ontario

Design and construction of a blast freezer tunnel for an adhesive compound by means of a two-stage refrigeration unit with an internal conveying system. 

FASSON CANADA

Ajax, Ontario

An automated tank farm designed to store and deliver, under computer control, adhesives to high speed paper coating machinery.  The system implemented a  Reliance Electric "AutoMax" DCS.

 

HENDRIX WIRE AND CABLE

Milford, New Hampshire

Performed study and initial engineering for an ultra-clean material handling system to deliver plastic compound from rail cars and other bulk containers to plastic processing machinery.  Project included design of a rail car garage facility connected to a railroad spur line complete with a class 10,000 HVAC system.

ALCATEL CANADA WIRE

Toronto, Ontario

Design and construction of 120 ton combination evaporative cooling and mechanical refrigeration plant.  Cooling water plant featured  a  Reliance Electric "AutoMax" DCS (Distributed Control System).

ALCATEL CANADA WIRE

Quebec City, Quebec

Design and construction of a class 10,000 clean room facility for the handling of insulation and shield compounds, complete with a sophisticated HVAC and controls system.

ALCATEL CHESTER CABLE

Chester, New York

Design and construction of a computerized bulk handling system to service power cable manufacturing facility.  Project included total integration of an Allen-Bradley "Data Highway+" PLC network control system.

ALCATEL CANADA WIRE

Weyburn, Saskatchewan

Design and construction of a class 10,000 clean room facility for the handling of insulation and shield compounds, complete with a sophisticated HVAC and control system.

PRC CANADA INC.

Rexdale, Ontario

Design of an explosion proof laboratory and small batch manufacturing facility for volatile chemical compounds.

ONTARIO MINISTRY OF ENERGY

Conducted energy audits of industrial process equipment for the following companies:

·         Plax, Inc. in Brampton and Burlington - injection and blow moulding, material handling, plant ventilation, refrigeration

·         Olsonite Ltd. in Tilbury - injection moulding, material handling, process cooling

·         ABC Group in Mississauga - injection moulding, process cooling, plant ventilation, material handling

·         Bi-Ax International in Tiverton - polypropylene film production, process heating and cooling, plant ventilation

·         Witco Ltd. in Brantford - powdered laundry detergent manufacturing

·         Torcan Chemical in Aurora - pharmaceuticals, chemical reactors, refrigeration and ventilation

NUCON SYSTEMS INC.

Richmond Hill, Ontario

Design and construction of a computerized bulk handling system to service power cable manufacturing facility.  Project included total integration of an Allen-Bradley "Data Highway +" PLC network control system.

TREMCO LTD.

Leaside, Ontario

Analysis of process and production facilities, quantification of energy and water consumption, running of customized computer simulation models, and design of energy and water conservation schemes, including technical and economical feasibility.

ALCATEL CANADA WIRE

Toronto, Ontario

Design and construction of a class 1,000 clean room and bulk material handling facility for the handling of insulation and shield compounds, complete with a sophisticated HVAC and controls system.  Integration featured a Reliance Electric "AutoMax" DCS.  Responsibilities included writing custom communication protocol with various proprietary devices. 

RESOURCE PLASTICS INC.

Brantford

Electrical and Automation engineering for a new plastic recycling line.  Control system is based on a Allen-Bradley PLC-5 platform running a Windows based graphics interface package. 

NUCON SYSTEMS INC.

Richmond Hill

Development of a standardized, modern control system for pneumatic conveying and bulk handling equipment.

TREMCO LTD.

Toronto, Ontario

Performed a detailed study of the company's existing production and storage facilities for hazardous chemicals for compliance with current regulatory requirements.  Recommendations given for changes and improvements, including budgetary cost estimates.

RESOURCE PLASTICS INC.

Brantford, Ontario

Design and installation of an automation system for a plastics recycling operation utilizing an Allen-Bradley PLC platform integrating process control, motor control, bulk handling and packaging functions. A graphical fully interactive process man machine operating system was implemented.  Scope included the selection of all instrumentation and preparation of power and control drawings.

   

IGI INTERNATIONAL WAXES

Toronto, Ontario

Analysed the performance of a process wax  granulator cooling system.  Recommended improvements, alterations and retrofits to refrigeration system and air filtration  system.

 

RIMPLY MFG.

Newmarket, Ontario

Investigation of a 200 Ton cooling tunnel for auto part temperature control.  Responsibilities included making recommendations on redesigning the system, improving year-round operation and implementing process controls.

PAINTPLAS INC.

Ajax, Ontario

Detailed mechanical design of a down draft paint booth system.  Responsibilities included all mechanical and electrical design and equipment  selection.

RIMPLY MFG.

Newmarket, Ontario

A 15 Million dollar plant revitalization project.  Responsibilities include all process, mechanical and electrical engineering. Responsibilities  also included process automation implementing a distributed PLC system with supervisory PC control.

COURTAULDS AEROSPACE

Rexdale, Ontario

Design of various processing and packaging machinery for aerospace sealants and coatings.  Responsibilities included mechanical design, automation and commissioning.

CANADIAN OXY

Tottenham, Ontario

Process analysis and recommendations regarding the upgrading of high temperature calendering machinery for Rigid PVC facility.

ASHLAND CHEMICAL COMPANY

Mississauga, Ontario

Five million dollar flammable liquid warehouse upgrade. Project included construction of a 20,000  sq. ft. warehouse expansion, two-bay 1,000 lb. truck scale complete with PLC based automated drumming and material handling system, and an automated foam deluge high density sprinkler system.  Responsibilities included mechanical, electrical and structural design, MOE and Municipal approvals, process control design and commissioning, and operator training.

REGION OF DURHAM

Ajax, Ontario

In association with another consulting firm, G.M. Sernas & Associates, Design of a sewage pumping station, including automated SCADA systems.

WYCLIFFE HOMES

Uxbridge, Ontario

Town of Uxbridge water pumping station for residential subdivision expansion.

ASHLAND CHEMICAL COMPANY

General Polymers Division

Mississauga, Ontario

General facility upgrade for handling flammable liquid storage  which included high density sprinkler design, dyke containment and fire-proofing.

CANPRESS

Pickering, Ontario

Automated control system for a blast chamber operated by Canada Energy Mines and Resources.

HOSTMANN-STEINBERG

Brampton, Ontario

Design and implementation of a TXIB dispensing system for an ink manufacturing operation consisting of storage tanks and a piping network with applicable controls.

GOODYEAR CANADA

Bowmanville, Ontario

Review and redevelopment of control system for tire production plant including upgrades to PLC hardware and software as well as a Y2K review of all process and control equipment.

MIROLIN INDUSTRIES

(div. of Masco Corp.)

Toronto, Ontario

Design Engineering for an expansion and upgrade of a polymer resin batching process including customized storage tanks and a recipe/dispensing control system capable of ±2% accuracy.

ASHLAND CHEMICAL COMPANY

Mississauga, Ontario

Engineering and project management for the upgrade of a railcar unloading facility at a chemical storage and distribution plant.  Project included addition of a second rail spur, pumps and piping to tie into existing tank farm and control system redevelopment to accommodate the expansion.

 

 